

Build Leaders. Build Systems. Sustain Excellence

From a $15K Monthly Deficit to Profitability in 120 Days
A STRATEGIC OPERATIONAL OVERHAUL TRANSFORMED A FAILING $90K UNIT INTO A PROFITABLE OPERATION.

This location was operating at a significant loss with major gaps across the operation. Labor scheduling was chaotic with no system in place. Inventory counting didn't exist, no inventory sheets, no tracking path, nothing. The menu recipes were overly complicated with too many steps, causing mistakes and confusion for the staff, leading to inconsistent products. Staffing was weak, both in structure and personnel. The food supplier was unreliable, delivering at random times and charging premium pricing because no one had negotiated better rates. Worst of all, the POS system wasn't accurately tracking food costs, making end-of-month P&Ls nearly impossible to pull together accurately.
The result? A $90k/month location losing $15k every single month.


Labor Scheduling System
Staffing Overhaul
Problem:
No scheduling structure. Labor costs at 34%.
Problem:
Weak team structure and poor performers across the board.
Solution:
Built a new scheduling system in Excel with optimized time slots to match demand patterns. Result: Labor dropped to 22%.
Solution:
Attempted retraining with existing staff first. When that didn't work, replaced 60% of staff with stronger performers. New team executed new systems with discipline.
Recipe Simplification
Inventory System Overhaul
Problem:
Menu recipes had too many steps, causing mistakes and inconsistency.
Problem:
No counting. No tracking. No inventory sheets or paths.
Solution:
Streamlined recipes to reduce complexity and improve accuracy.
Solution:
Created a complete inventory counting system with daily tracking sheets and a clear inventory path to identify waste and discrepancies.
POS System Audit & Reconfiguration
Food Supplier Change & Negotiation
Problem:
POS wasn't tracking food costs accurately. End-of-month P&L was unreliable.
Problem:
Current supplier was unreliable (random delivery times) and charging premium pricing with no negotiated rates.
Solution:
Completely reset the POS to accurately track sales, pull correct recipes, ingredients, and measurements. This revealed exact food cost gaps in the P&L.
Solution:
Switched suppliers and negotiated significantly better pricing based on volume and consistency.
Month 1
Month 2
Month 3
Month 4
FOUNDATION
OPTIMIZATION
EXECUTION
RESULTS
(Labor Scheduling & Inventory)
(POS Audit & Supplier Change)
(Staffing Overhaul)
(First Month Profitable)
THE 4-MONTH TRANSFORMATION TIMELINE
What Was Fixed